Case 01 / Waihi residential / 2024

Karl’s full house replumb & gas termination.

Karl's replumb in progress
Location
Waihi
Scope
Full replumb + gas termination
Trades
Plumbing, Gas
Outcome
5★ testimonial

The brief

Karl’s house was on its original copper. He wanted the lot redone – new water lines through the whole house, hot water reworked, plus the gas terminated and re-run cleanly. The kind of job that sets the tone for the next thirty years.

What we did

Stripped the existing pipework, ran new lines through the wall cavities and floor, terminated the gas at the meter and re-ran the supply, set up the hot water and brought everything online with full pressure tests. Mid-project Karl decided on additions – we absorbed the changes without dragging the timeline.

Pipework Mid-project Hot water Gas line Gas termination Tidy finish

Karl said

“Mike and Nathan helped me with a full replumb. I decided on additions midway through, the lads had no issue with this and were super accommodating.”
– Karl S.